Running Your Business

Switching POS Systems: Opening Stock and Go-Live Checks for Philippine Shops

Move to a new POS without duplicating sales or stock. Use a cutover worksheet, branch-level opening balances and a first-shift check for a Philippine shop.

To switch POS systems safely, set a cutover time, verify your catalog, count stock at each location, and decide which system owns transactions on each side of that time. Keep historical sales available for reference without treating them as new sales. Reconcile the first live shift before expanding the rollout.

For a Philippine shop or café, the details include piece-versus-case quantities, products with sizes, peso prices, cash and merchant QR payments, and branch-specific records. Installing the app is only one part of the move. The real handover is from one set of business records to another.

This is a workflow for a business that has already chosen a system. If you are still comparing products, start with the POS trial scorecard. Confirm the separate BIR documentation and invoice checks before changing how your business issues invoices.

Decide what moves and what stays as history

Do not start by uploading every spreadsheet you can find. First describe the job of each record and how the new system will use it.

Record Migration decision Evidence to keep
Product catalog Map each sellable item, variant and unit to the new catalog. Old identifier, new identifier, name, unit and approved price.
Opening stock Establish quantities at a named location and cutover time. Count sheet, movement adjustments and accepted opening balance.
Historical sales Preserve a readable reference; only import if the provider demonstrates a suitable historical-data workflow. Original exports, date range, definitions and reconciliation totals.
Open orders or deposits Assign an owner and agreed continuation method. Original reference, fulfillment status, payment already received and remaining action.
Staff access Create appropriate individual access and test it. Role, branch scope and successful/blocked task results.

The table is an editorial planning template, not a claim that Sentra or another product supports every import type. Ask the provider what it can import, what it cannot, and how to reverse or correct a failed import. An unsupported field should remain an explicit migration issue, not silently disappear.

Keep a secure, unchanged copy of the source exports before cleaning them. Record the original timezone, branch filters and report definitions. “October sales” is not enough if one export covers only one branch or omits refunds.

Make the product map unambiguous

Give each stock item a stable identity. Names such as “Water,” “Water bottle” and “Bottled water 500 mL” may refer to the same item—or to different sizes. Resolve that before comparing counts.

A useful map includes:

  • Old identifier and the new identifier or SKU.
  • Product name and variant, such as size or color.
  • Stock unit, purchase-pack size and conversion rule.
  • Approved peso selling price and the owner of price changes.
  • Branch availability and whether the item tracks stock.

For a hypothetical convenience shop, one purchased case contains 24 bottles, while checkout sells bottles. Five cases therefore represent 120 bottles. Loading “5” as the opening bottle quantity creates a different problem from a cashier selling the wrong item: the first error is in the migration unit.

Do not combine café ingredients and finished drinks into one stock number. Whether selling a latte reduces beans and milk depends on the actual system’s recipe capability and setup. Verify it separately, using the inventory unit and ingredient worksheets.

Choose a cutoff that your team can follow

Name the last transaction handled by the old system and the first handled by the new one. Use a full date and time in Philippine time, plus the branch. “After closing” can be ambiguous when cleaning, late orders or deliveries continue.

For example: “Branch A switches after its final old-system sale at the agreed close on October 28.” This is a hypothetical instruction; use your actual operating date and reference. Record the last old-system transaction reference and new-system starting reference in the handover.

During the stock count, either pause movements or log every movement that continues. Assign one person to record late sales, accepted deliveries, returns, damage and transfers. A physical count becomes unreliable as an opening balance if goods move afterward and nobody records the change.

Open orders need special care. If a customer already paid a deposit through GCash, carrying the order forward must not record that deposit as a second payment. Agree with your provider and bookkeeper how to preserve the original reference, payment evidence and remaining balance. Do not invent a new sale just to make an old balance appear on the new dashboard.

Bridge the count to the opening balance

The following hypothetical example tracks bottles at one branch. All quantities use the same unit. The count happens before the final old-system transactions, so those movements must be included once.

Event Bottles Resulting quantity
Physical count before final trading 144 144
Old-system sales after count, before cutover −6 138
Customer return inspected and accepted back into sellable stock +2 140
Damaged bottles separated from sellable stock −3 137
Opening sellable stock loaded into new system — 137
Delivery accepted after cutover: one case of 24 +24 161

The opening balance is 137, and the delivery is a subsequent movement of 24. Loading 161 as the opening balance and also receiving the case adds the delivery twice. Leaving the balance at 144 ignores the movements between count and cutover.

A refund does not automatically mean stock is sellable again. Record the physical inspection and destination of a return separately; see the returns and stock-disposition guide.

Copy this compact bridge for each item/location:

Branch/location:
Item identifier and stock unit:
Count date/time and quantity:
Movements between count and cutover, each with a reference:
Accepted opening quantity at cutover:
Quantity entered in new system:
Difference and explanation:
Prepared by / checked by / date:

For stock moving between branches, agree which location owns it at cutover and keep the transfer reference. A dispatch at one branch and a receipt at another must not become two opening quantities. Use the multi-branch transfer worksheet for the movement trail.

Run a small acceptance test before the first real shift

Use agreed test records and keep them separate from live sales and official invoice sequences. Ask the provider to demonstrate the safe testing method for its system.

Test an ordinary item, a variant, a return, a stock adjustment, and every payment method you accept. Confirm the item quantity, price, branch and authorized staff identity in the resulting records. If your counter accepts cash and merchant QR, verify both the POS entry and the payment-provider evidence: selecting “QR” in a POS is not proof that money arrived.

Check exports as well as screens. Can the owner or bookkeeper retrieve the necessary records, identify the relevant dates and branch, and follow a correction back to its original transaction? Do not accept “export available” without opening a sample file.

If you use Sentra, the support guides explain how to check the selected branch, complete a POS sale and investigate inventory differences. Use these to prepare actual operating tests; confirm migration assistance and import scope with Sentra Support rather than assuming a bulk-import route.

Reconcile the first shift and keep a recovery decision

At the first close, compare the accepted opening balances with the new system’s activity. Check the cash drawer separately from card and merchant QR records, investigate unexplained stock differences, and review open orders. The daily reconciliation guide supplies the closing procedure.

Name the person who decides whether a material problem requires pausing the rollout. Keep the old records accessible and agree on the approved continuity procedure before launch. Returning to an old workflow must not leave staff recording the same live sale in two systems or issuing duplicate documents.

Maintain a short issue log with the original reference, expected result, actual result, responsible person and resolution evidence. Correct the cause before repeating the migration at another branch. A successful switch ends with reconciled records and a team that can run the next shift—not merely a completed installation.

Practical knowledge. A clearer next step.
More from Sentra Insights